Download Six Sigma.ICBB.Pass4Sure.2018-12-08.114q.vcex

Download Exam

File Info

Exam IASSC Certified Lean Six Sigma Black Belt
Number ICBB
File Name Six Sigma.ICBB.Pass4Sure.2018-12-08.114q.vcex
Size 1 MB
Posted Dec 08, 2018
Download Six Sigma.ICBB.Pass4Sure.2018-12-08.114q.vcex


How to open VCEX & EXAM Files?

Files with VCEX & EXAM extensions can be opened by ProfExam Simulator.

Purchase

Coupon: MASTEREXAM
With discount: 20%






Demo Questions

Question 1

Fractional Factorial, ____________and Response Surface Method are types of planned experiments.


  1. Multi-Vari Analysis
  2. Baldridge Channels
  3. One Factor at a Time or OFAT
  4. Factorial Design
Correct answer: D



Question 2

Relative to a Design of Experiments the term ________________ refers to variables being a linear combination of each other. 


  1. Mirror Image
  2. Directly Parallel
  3. Collinear
  4. None of the above
Correct answer: C



Question 3

Which statement(s) are incorrect about Fractional Factorial Designs?


  1. A Half Fractional Design for 5 factors has the same number of experimental runs as a Full Factorial Design for 4 factors assuming no repeats or replicates or Center Points
  2. Quarter Fractional experiments can exist for those with 4 factors
  3. Resolution V design is desired while controlling costs of experimentation
  4. Half Fractional experiments do not exist for those designs with only 2 factors
Correct answer: C



Question 4

If in an experiment all possible variable pairs sum to zero the design is Orthogonal.


  1. True
  2. False
Correct answer: A



Question 5

Which Experimental Design typically is most associated with the fewest number of input variables or factors in the design?


  1. Fractional Factorial design
  2. Full Factorial design
  3. Simple Linear Regression
  4. Response Surface Design
Correct answer: D
Explanation:



Question 6

The method of Steepest Ascent guides you toward a target inside the original inference space.


  1. True
  2. False
Correct answer: B



Question 7

Situations where standardized work needs to be incorporated include all of these except _____________________.


  1. Machines continually operating to reduce the labor cost per piece
  2. Lack of a system to assure proper inventory levels at repair stations
  3. Changeover instructions incomplete
  4. Process flow for the same product assembly taking various cycle time for completion
Correct answer: A



Question 8

The Lean toolbox includes all of these items except ________________.


  1. Mistake Proofing
  2. Visual Factory
  3. Design of Experiments
  4. Inventory Management 
Correct answer: C



Question 9

Questions that can be best answered by a Visual Factory include all of these except _____________________.


  1. Are downtime issues easily noted?
  2. Can extra inventory be seen easily?
  3. Are unneeded tools or supplies easily noted?
  4. Are setups optimized for lower scrap levels?
Correct answer: D



Question 10

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?


  1. Review the Visual Factory to assure inventory in excess of desired visible
  2. Improve the lighting to assure adequate visibility
  3. Analyze data from supplier deliveries
  4. Reword the standardized work instructions to use active verbs and not passive phrases
Correct answer: A
Explanation:









PROFEXAM WITH A 20% DISCOUNT

You can buy ProfExam with a 20% discount!



HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files